Contact US
Name:
Email:
Message:
Hydro Power Plant in Prelle, Albania

Project Description

The operations related to this contract include the following tasks:
- Building Site Preparation
- Intake Structure 1 on Uraka River
- Headrace (from intake structure 1 to intake structure 2)
- Intake Structure 2 on Meltmi torrent
- In-tunnel Canal Section
- Loading Tank
- Penstock
- River bed traverse upstream of the plant and section up to the building
- Drainage
- Power House
 
Contract Value:             4,750,000 EUR
Construction Period:   14 months
Employer:                     Prell Energy Sh.p.k